Sea defences improved in Redcar, Cleveland.
Download© under license to London News Pictures. 18 March 2011..Work begins on the improvement of sea defences in Redcar in Cleveland. The work, costing £30m began with preliminary testing by drilling rig operations on the beach...The work on the 2.7km stretch of sea defences is expected to take two years and will be completed in sections to minimise disruption to local residents...Photo credit should read Ian Forsyth/LNP
- Filename
- LNP_Redcar_Seawall_IFP_0016.jpg
- Copyright
- ©under licence to London News Pictures. 59 Jeddo Road London W12 9ED +44 (0)208 354 4272 (mobile 07940573941) press@londonnewspictures.co.uk
- Image Size
- 3000x1996 / 1.6MB
- Contained in galleries

